River Center on The River by the Bridge set to Open by March Next Year

Jasper (NNDC):

The final leg of work ongoing at the site of the Jasper River Centre is underway.The project is mixed retail and residential and expected to ope around  is March 2020 opening.

Located inside the old Jasper Cabinet building off Third Avenue, the River Centre will host three restaurants and a handful of other shops on the ground level.

Seventy-six apartments will take shape on the second and third floors — set up with 20 floor plans. The cost at a $1.50from studios to two-bedroom living quarters ranging from $550 to more than $2,200, depending on the layout chosen.

The top floor will host a bar, and on first floor commercial spaces include St. Benedict’s Brew Works, FitFuel and Fueled Strength Meals, and Joelle + Co.

Remaining spaces will be announced in January or early February. The exact number that will be housed in the development has not been determined and is dependent upon how the space is broken up.

The rooftop bar is also positioned to become a highlight of the building as the view from that height is incredible.

Businesses interested in occupying retail space at the River Centre or readers wanting to rent an apartment are encouraged to contact Boxer Girl at 317-670-6329. More information can also be found at jasperrivercentre.com.

Speak Your Mind

*